Call us now :
+91- 986 632 1027
Email us now :
info@dudhanipoly.com
Procedure:-
The RCC Tank has to be cleaned and make sure it’s completely dry.
The 7mm HDPE Sheet will then be laid on the RCC walls with Bolting at regular Intervals.
Later with the help of an Extrusion Welding Machine Lining is done on Every Joint.